Fig. 1 The chart behind this note
Start with the cheap tonnes
Efficiency projects rarely make headlines, but they pay back fastest and free up cash for the harder moves. In this illustrative pathway, the first two years are almost all efficiency and on-site generation.
Then the structural moves
Electrifying heat, switching fuels and changing the asset base take longer and depend on grid connections and policy. Sequencing them after the quick wins means the business funds them from savings, not from a new capital request.
Years one and two: efficiency and controls
Years two to four: on-site generation and storage
Years three to six: electrification and asset changes
Keep the plan honest
Review the pathway every year against actual cost and grid timing. A plan that never changes is a plan nobody is using.